BS 7671 Part 6: Inspection, Testing, Certification

The Part 6 order of tests, the readings that pass, which certificate goes with which job — written for the paper and for AM2 section B on the rig.

The order of tests is the exam answer

Almost every Part 6 question that looks hard is really asking: which test comes next, and why can it not come earlier?

Dead (no supply) Live (energised)
Continuity of protective conductors, including main and supplementary bonding Earth fault loop impedance, Ze and Zs
Continuity of ring final circuit conductors Prospective fault current
Insulation resistance RCD operation
Polarity Phase sequence
— Functional testing

The reason for the split is not tradition. Insulation resistance is tested on a dead circuit, and a ring final continuity test is an ohmmeter test, but Zs and RCD times need the supply on. Do the dead tests first and you find a fault before you energise something with it.

The numbers Part 6 leans on

Insulation resistance: minimum 1 Mohm on a 230/400 V installation, tested at 500 V DC. Table 64. Below that is a fail, and the usual causes are damp, a trapped conductor or a borrowed neutral.

RCD operation: at rated residual current, not more than 300 ms; at five times rated residual current, not more than 40 ms. A device that trips at 62 ms on the five-times test is failing, even though it tripped.

Ring final continuity: the reading at each socket should be roughly the same all the way round, and near the expected r1+r2 figure. A socket reading double the others means the ring is broken and the figure is the long way round.

Which certificate, which job

Work done Document
New circuit, or a new installation Electrical Installation Certificate, with Schedule of Circuit Details and Schedule of Test Results
Alteration or addition to an existing circuit, no new circuit Minor Electrical Installation Works Certificate
Existing installation, periodic inspection Electrical Installation Condition Report

The EICR is the one people muddle. It is a report on condition, not a certificate of compliance for new work, and it comes with observations coded C1, C2, C3, FI and a satisfactory or unsatisfactory overall outcome. C1 and C2 both mean unsatisfactory; C3 is improvement recommended.

EICR intervals, in the words that get marked

BS 7671 gives the maximum interval by installation type, and other legislation can shorten it. For the paper, the two you will be asked about are the owner-occupied dwelling at 10 years and the privately rented dwelling in England at 5 years, with the rented one being a legal requirement rather than a recommendation.

What the paper does with Part 6

Three shapes of question:

  1. Sequence — which test and which certificate. Answer by the table above.
  2. Judgement — here is a reading, is it a pass? You need the limit, not the reasoning.
  3. Documentation — what goes on the schedule, and who signs what. The person doing the inspection and testing signs the certificate; that is a competence point, not a paperwork point.

Section B of the AM2 is this part, with a stopwatch

Three and a half hours, everything observed, BS 7671, GN3 and the On-Site Guide on the bench. The tests you perform are exactly the list above, in that order, followed by an EIC and its two schedules completed by hand. Candidates lose time on the paperwork far more often than on the testing — learn the shape of the forms in advance. The insulation, Zs and RCD drills are the three places that go wrong most often.

Is 1 Mohm the limit for every circuit?

No. Table 64 gives 1 Mohm for a 230/400 V installation tested at 500 V, and there are lower values allowed for some special installations and for large installations with many circuits. For the paper, know the 1 Mohm / 500 V baseline and that exceptions exist in Table 64.

Do I have to test a circuit I have only added to?

Yes. The addition has to be tested, and the existing circuit it hangs off has to be confirmed as able to carry it. That is why a minor works certificate still needs test results on it.

Is a periodic inspection the same as a verification?

No. Initial verification proves new work complies before it is handed over. Periodic inspection asks whether an installation that was compliant is still safe and still compliant.