BS 7671 Part 3: Assessment of General Characteristics

Part 3 is the survey before the design: maximum demand, diversity, the three earthing arrangements and the supply figures you are entitled to ask for.

Part 3 is the survey you do before you design

Before you can size a cable or choose a device you have to answer six questions about the installation itself: what load will it carry, what does the supply look like, what earthing arrangement is it, what protective measures are appropriate, what special locations are involved, and how many circuits are needed. Part 3 is that list, and in the exam it is the part that explains why a design detail is wrong.

Maximum demand and diversity

Maximum demand is the current the installation is expected to draw in normal use, not the sum of every rating on the board. Diversity is the recognised allowance that lets you design for less than everything on at once — a dwelling with a shower, a cooker and an immersion does not draw all three at full load for long.

The trap: diversity is an allowance in the design, not a licence to overload a circuit. Applying a diversity factor to a single final circuit is a wrong answer in every paper I have seen, and it is a real mistake in real work.

The earthing arrangement decides everything downstream

Arrangement What it means What follows
TN-S Separate neutral and earth from the supply Earth fault loop via the supply's metallic path
TN-C-S (PME) Combined neutral and earth in the supply, separate in the installation 0.4 s by disconnection; care with any metallic path leaving the equipotential zone
TT No metallic path back to the transformer Fault protection by RCD; 0.2 s

If you do not know the arrangement, you cannot pick the disconnection time, you cannot choose the protective measure, and you cannot answer a Part 4 question. In the AM2 this is section A1: identify what is feeding the board before you isolate it.

Supply characteristics you are entitled to ask for

Nominal voltage, frequency, prospective fault current at the origin, the earth fault loop impedance external to the installation (Ze), and the type of earthing. A distributor will give you these on request, and a design that assumes them is a guess. Questions that give you a Ze of 0.35 ohm are giving you a number to compare, not to ignore.

Circuits, conductors and devices

Part 3 also asks you to count and describe what you are installing: how many final circuits, what each serves, the current each draws, the cable type and installation method, and the protective device for each. This is the schedule of circuit details before it is a schedule — get it right in design and Part 6 becomes a matter of measuring what you already wrote down.

Special locations are a Part 3 flag, answered by Part 7

Part 3 tells you to identify whether the installation includes a location with restricted conditions — a bathroom, a swimming pool plant room, a construction site, a caravan, a medical location. Part 7 then gives the extra requirements. In the exam this link is worth remembering: a question that mentions a bathroom is usually a Part 7 question wearing a Part 3 coat.

Where people lose marks here

Three habits. Treating diversity as a factor you can invent. Ignoring Ze because “the DNO said it was fine”. And taking a maximum demand from the customer's description of their life rather than from the equipment being installed — a heat pump and an EV charger change the answer, and they are usually mentioned in the question.

Do I need to calculate diversity in the exam?

You may be asked to apply a given allowance to a set of loads, but you will not be asked to invent one. Know how to use On-Site Guide tables and what the concept is for.

What is Ze and why does it matter?

Ze is the earth fault loop impedance of the supply, measured at the origin. It is the floor under every Zs reading you will later take, so a design that cannot meet disconnection times with the given Ze is a design problem, not a test problem.

Does Part 3 apply to domestic work?

Yes — a single dwelling still gets assessed, just with fewer circuits. The principles are identical.